A&D OP-05 Spécifications Page 14

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 90
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 13
12
6) To change a blown fuse.
Turn the power off and wait 10 seconds or more. Replace the
fuse with the accessory fuse without touching other parts.
Make sure that no stray material is left in the case, screws,
spacer, etc., before closing the case.
3-3 LOAD CELL
For a load cell cable, the use of a 6 wire shielded cable is recommended in order to reduce weighing error.
When using a 4 wire cable, connect pin no. 1 to no. 2 (load cell applied voltage + and sensing input +), and pin no. 3 to
no. 4 (load cell applied voltage - and sensing input -).
Vue de la page 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 89 90

Commentaires sur ces manuels

Pas de commentaire